All Entries in the "TLS #53" Category
Sealing an Earth Floor – TLS # 55
This is the second of a two-part article on creating a poured adobe or earth floor. See Earth Floor, TLS#52, for the first article describing how to prepare for and install a poured adobe floor.
By Tom Lander – New Mexico, USA
Now, weeks later after your floor is 100 percent dry, it’s time to seal and [...]
Straw-bale Sound Isolation and Acoustics – TLS #53
This article appeared in TLS #53. The topic of this issue is Moisture. It contains an extensive article about Moisture Basics and Straw-Bale Moisture Basics (by John Straube, edited by Bruce King) it also includes articles on moisture meter accuracy, moisture sensors, seismic resistance, and plaster testing.
by Rene Dalmeijer – The Netherlands
In June 2003, [...]
































