RSSAll Entries in the "TLS #50" Category

Where to Draw the Line – TLS #50

Where to Draw the Line – TLS #50

This article appeared in TLS #50.
by Chris Newton – Queensland, Australia
Can you design and build straw-bale homes for a hot and humid climate? Living in Queensland, Australia, I am frequently asked to identify an invisible line on the map where “she’ll be right” applies on one side of the line and “don’t go there” [...]

Bale Preparation – TLS #50

Bale Preparation – TLS #50

This article originally appeared in TLS issue #50, 2005
by Tony Caniglia – Colorado, USA
This technique was developed to reduce the amount of fill with loose straw
or straw/clay required when the bent (rounded) sides of the bales are butted
together. The purpose is to remove the bulge on the ends of the bales so
that the bales are [...]

Tips about Bales – TLS #50

Tips about Bales – TLS #50

This article orignally appeared in issue #50, 2005
by Joyce Coppinger – Nebraska, USA
Tips about Bales
Why wait until you have the framing done and the roof on before finding
your bales. Find your bales during the planning process and well before you
begin construction. Knowing the size of the bales before you design the
building will help you determine [...]